WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan dan Solusi (Re)Asuransi – Rabu 05 Mei 2021 | 0900 – 1200 | POJK no. 44/2020

0
1798

WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan dan Solusi (Re)AsuransiRabu 05 Mei 2021 | 0900 – 1200 | POJK no. 44/2020

 

Telepon:

  • Muhammad Subhan 0817009246 dan 081808024856
  • Ridho 087886475560
  • Yeti 081908290039

Image result for zoom application icon

wda-port-risks-and-reinsurance-050521

 

Registration Link:

https://bit.ly/Seminar-WDA-5Mei21

 

Rencana Pembangunan Jembatan Babin Masuk RPJMN 2020-2024 | Dan Analisis Risiko dan Asuransinya

Risiko Terkait:

https://www.bbc.com/news/world-asia-china-37927158

 

https://www.cii.co.uk/news-index/articles/risk-engineer-project-engineer/58893

 

https://www.tribunnews.com/regional/2019/07/15/penjelasan-pelindo-iii-soal-insiden-kapal-tabrak-crane-hingga-roboh-di-dermaga-tanjung-emas

 

 

 

 

 

 

Facebook Comments