CII Webinar – Projects Insurance for Renewable Energy in Indonesia, 18 May 2023 –...
CII Webinar - Projects Insurance for Renewable Energy in Indonesia, 18 May 2023 - Thursday 18 May 2023, 2:00 PM - 3:00PM (GMT+8)
Tautan Pendaftaran:
https://event.on24.com/wcc/r/4208340/21DC30D04A5E76B564FF67C9CD9E75B5
Email...
3 Penyebab Utama Kerusakan pada Mesin Industri
3 Penyebab Utama Kerusakan pada Mesin Industri
12 October 2018 10:56
Layaknya tubuh manusia, mesin industri juga harus selalu dirawat. Tingkat perawatannya disesuaikan dengan tingkat penggunaannya....
LPMA Trisakti – Bedah Polis Asuransi Konstruksi/Pemasangan CPI – Comprehensive Project Insurance – Selasa,...
LPMA Trisakti – Bedah Polis Asuransi Konstruksi/Pemasangan CPI – Comprehensive Project Insurance – Selasa, 14 Maret 2023
Link/Tautan Pendaftaran:
http://bit.ly/3XpVE5Y
https://cepagram.com/index.php/2023/02/15/lpma-trisakti-bedah-polis-asuransi-konstruksi-pemasangan-cpi-comprehensive-project-insurance-selasa-07-maret-2023/
https://cepagram.com/index.php/2023/01/20/lpma-trisakti-bedah-polis-asuransi-infrastruktur-cecr-civil-engineering-completed-risks-selasa-07-februari-2023/
https://cepagram.com/index.php/2023/01/05/lpma-trisakti-bedah-polis-asuransi-car-contractors-risks-selasa-17-januari-2023/
https://cepagram.com/index.php/2022/11/23/lpma-stma-trisakti-analisis-risiko-konstruksi-dan-operasional-jalan-tol-dan-solusi-reasuransinya-selasa-29-november-2022/
https://cepagram.com/index.php/2022/11/17/lpma-stma-trisakti-analisis-risiko-konstruksi-dan-operasional-jalan-tol-dan-solusi-reasuransinya-selasa-22-november-2022/
WDA Pelatihan ONLINE – Analisis Risiko Operasional dan Konstruksi Pabrik Karet termasuk Analisis Klaim...
WDA Pelatihan ONLINE - Analisis Risiko Operasional dan Konstruksi Pabrik Karet termasuk Analisis Klaim dan Solusi (Re)asuransi sejalan dengan POJK 44/2020 – Rabu, 22...
WDA Online Training | Bedah Polis Asuransi IAR Munich RE Baru 2017 Sejalan dengan...
WDA Online Training | Bedah Polis Asuransi IAR Munich RE Baru 2017 Sejalan dengan Tujuan POJK no. 44/2020 terkait Pengelolaan Manajemen Risiko Perusahaan |...
Endorsement 102 Special Conditions Concerning Underground Cables, Pipes and Other Facilities – Endosemen...
Endorsement 102 - Special Conditions Concerning Underground Cables, Pipes and Other Facilities
It is agreed and understood that otherwise subject to the terms, exclusions, provisions...
Endorsement 011 Serial Losses – Endorsement 011 – Kerugian berseri
Endorsement 011 Serial Losses
It is agreed and understood that, otherwise subject to the terms, exclusions, provisions and conditions contained in the Policy or endorsed...
Endorsement 010 Exclusion of Loss, Damage or Liability Due to Flood and Inundation –...
Endorsement 010 - Exclusion of Loss, Damage or Liability Due to Flood and Inundation
It is agreed and understood that otherwise subject to the terms,...
CAR Section I – Material Damage – Bagian I – Kerusakan Material Asuransi CONTRACTOR’S...
Section I - Material Damage
The Insurers hereby agree with the Insured that if at any time during the period of cover the items or...
CAR Period of Cover – Jangka Waktu Jaminan Asuransi CONTRACTOR’S ALL RISKS
Period of Cover:
The liability of the Insurers shall commence, notwithstanding any date to the contrary specified in the Schedule, directly upon commencement of work...