Sunday, November 27, 2022

BANKERS CLAUSE – KLAUSULA BANK

BANKERS CLAUSE It is noted and agreed that the property insured by this Policy has been mortgaged with PT BANK ... and that in consequence...

LPMA STMA Trisakti – Asuransi INFRASTRUKTUR melalui bedah polis CECR(Civil Engineering Completed Risks) –...

LPMA STMA Trisakti - Asuransi INFRASTRUKTUR melalui bedah polis CECR(Civil Engineering Completed Risks) - Selasa, 18 Oktober 2022   Link Pendaftaran: https://tinyurl.com/mx94sru7          

Unauthorized drainage works caused flooding at Pasir Ris-Tampines junction, PUB to take action against...

Unauthorised drainage works caused flooding at Pasir Ris-Tampines junction, PUB to take action against company Flooding was reported at the junction of Tampines Avenue 10...

Part of park connector near Clementi BTO site closed after landslide – Penghubung taman...

Part of park connector near Clementi BTO site closed after landslide The site has now been cordoned off for public safety. ST PHOTO: JOYCE FANG Shermaine Ang and Yong...

LPMA STMA Trisakti – Asuransi INFRASTRUKTUR melalui bedah polis CECR(Civil Engineering Completed Risks) –...

LPMA STMA Trisakti - Asuransi INFRASTRUKTUR melalui bedah polis CECR(Civil Engineering Completed Risks) - Selasa, 11 Oktober 2022     Link Pendaftaran: https://tinyurl.com/mx94sru7     https://cepagram.com/index.php/2021/07/28/lpma-trisakti-bedah-polis-asuransi-cecr-civil-engineering-completed-risks-kamis-19-agustus-2021/   https://cepagram.com/index.php/2020/09/09/lpma-trisakti-webworkshop-insurance-advanced-series-bedah-polis-asuransi-cecr-munich-re-wording-selasa-29-09-2020-pukul-0830-1130/ https://cepagram.com/index.php/2020/05/15/cepajasa-dan-asuransi-bosowa-mengadakan-pelatihan-asuransi-infrastruktur-polis-cecr-civil-engineering-completed-risks-dan-implementasinya-2/  

WDA Online Training | Analisis Risiko Operasional dan Konstruksi PerTAMBANGan, termasuk Analisis Klaim dan...

WDA Online Training | Analisis Risiko Operasional dan Konstruksi PerTAMBANGan, termasuk Analisis Klaim dan Solusi Reasuransinya Sejalan dengan Tujuan POJK no. 44/2020 terkait Pengelolaan...

WDA – Pelatihan ONLINE – Analisis Risiko Mall dan Hotel dan Solusi (Re)Asuransi –...

WDA – Pelatihan ONLINE – Analisis Risiko Mall dan Hotel dan Solusi (Re)Asuransi – Rabu, 21 Desember 2022 | 0900 – 1200 | POJK no....

Analisis Risiko Konstruksi WET-RISKS (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020...

Analisis Risiko Konstruksi WET-RISKS (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020 –  Rabu, 14 Desember 2022     Link Pendaftaran:  https://bit.ly/Seminar-14Des22 https://cepagram.com/index.php/2022/06/03/analisis-risiko-konstruksi-wet-risks-klaim-dan-solusi-reasuransi-sejalan-dengan-pojk-no-442020-13-juli-2022/   https://cepagram.com/index.php/2021/04/28/analisis-risiko-konstruksi-wet-risks-klaim-dan-solusi-reasuransi-sejalan-dengan-pojk-no-442020/   https://cepagram.com/index.php/2021/12/08/swiss-re-epi-56-cofferdam-endorsement/  

WDA Online Training | Analisis Risiko Konstruksi dan Operasional Jembatan, Analisis Klaim dan Solusi...

WDA Online Training | Analisis Risiko Konstruksi dan Operasional Jembatan, Analisis Klaim dan Solusi Reasuransinya Sejalan dengan Tujuan POJK no. 44/2020 terkait Pengelolaan Manajemen...

WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan Udara termasuk Analisis...

WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan Udara termasuk Analisis Klaim dan Solusi (Re)Asuransi – Rabu 30 November 2022 |...