Friday, June 2, 2023

LPMA TRISAKTI | WORKSHOP ONLINE:“Analisis Polis Asuransi CEAR – Construction and Erection All...

LPMA TRISAKTI | WORKSHOP ONLINE:“Analisis Polis Asuransi CEAR – Construction and Erection All Risk Policy Munich RE versi Juli 2015” | Rabu, 22 April 2020     Profil Trainer: https://www.cii.co.uk/membership/international/goodwill-ambassadors/russel-effandy-biography/   Tulisan...

SANY Rotary Drilling Rig SR 150C

contact us: +6281293617419   https://cepagram.com/index.php/2019/11/20/apakah-comprehensive-project-insurance-asuransi-proyek-komprehensif/ https://cepagram.com/index.php/2019/10/16/asuransi-alat-berat-konstruksi-contractors-plant-machinery-cpm-insurance/ https://thejournal.cii.co.uk/news/cii-ambassador-supports-local-training-in-indonesia/ https://www.youtube.com/watch?v=ZAg3ECpwIiM

LPP Indonesiaku CERDAS | Workshop Asuransi Alat-alat Berat | Analisis Polis CPM Munich RE...

LPP Indonesiaku CERDAS | Workshop Asuransi Alat-alat Berat | Analisis Polis CPM Munich RE dan Aplikasinya | Senin, 31 Agustus 2020 | 0900 s/d...

MAJOR RISKS ASSOCIATED WITH DAM CONSTRUCTION – Risiko Utama dalam Konstruksi Bendungan

MAJOR RISKS ASSOCIATED WITH DAM CONSTRUCTION A dam is a Civil Engineering construction which serves to contain the water of a natural course with...

Analisis Risiko Konstruksi dan Operasional DAM – Bendungan (Klaim dan Solusi Reasuransi) – Sejalan...

Analisis Risiko Konstruksi dan Operasional DAM - Bendungan (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020 – 03 Agustus 2022     Link Pendaftaran: https://bit.ly/Seminar-3Aug22

Apakah Comprehensive Project Insurance – Asuransi Proyek Komprehensif

Comprehensive project (CP) insurance - Non-renewable (one off) covers Comprehensive project insurance offers all-in-one insurance protection for the entire duration of a project. The multi-line...

WDA – Pelatihan ONLINE – Analisis Pabrik BAJA dan Solusi (Re)Asuransi – Rabu 26...

WDA – Pelatihan ONLINE – Analisis Pabrik BAJA dan Solusi (Re)Asuransi – Rabu 26 Mei 2021 | 0900 – 1200 | POJK no. 44/2020 Telepon: ...

WDA – Pelatihan ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit...

WDA – Pelatihan ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit Listrik Tenaga Uap Batubara dan Asuransinya Sejalan dengan Tujuan POJK no....

Analisis Risiko – Financial Gap dan Parametric Insurance – Sejalan dengan POJK no. 44/2020...

Analisis Risiko – Financial Gap dan Parametric Insurance – Sejalan dengan POJK no. 44/2020 - 18 Agustus 2022      Link Pendaftaran: https://bit.ly/Seminar-18Aug22   https://cepagram.com/index.php/2021/12/18/disaster-risk-financingdrf-pembiayaan-risiko-bencana/ https://cepagram.com/index.php/2020/09/19/evolution-parametric-insurance-evolusi-asuransi-parametrik/ https://cepagram.com/index.php/2020/06/12/apakah-asuransi-paramaterik-parametric-insurance/ https://cepagram.com/index.php/2020/06/04/asuransi-parametrik-parametric-insurance-fills-gaps-traditional-insurance-falls-short/ https://cepagram.com/index.php/2020/05/30/kisah-lain-tentang-asuransi-parametrik-triggered-parametric-insurance-natural-catastrophe-losses/      

WDA Webinar – Faulty Design dalam Asuransi Konstruksi CAR – Rabu 08 Juli...

WDA Webinar - Faulty Design dalam Asuransi Konstruksi CAR  - Rabu 08 Juli 2020 - 0900 s/d 1200 Telepon: Muhammad Subhan 0817009246 dan 081808024856 Ridho 087886475560 ...