LPMA TRISAKTI | WORKSHOP ONLINE:“Analisis Polis Asuransi CEAR – Construction and Erection All...
LPMA TRISAKTI | WORKSHOP ONLINE:“Analisis Polis Asuransi CEAR – Construction and
Erection All Risk Policy Munich RE versi Juli 2015” |
Rabu, 22 April 2020
Profil Trainer:
https://www.cii.co.uk/membership/international/goodwill-ambassadors/russel-effandy-biography/
Tulisan...
SANY Rotary Drilling Rig SR 150C
contact us: +6281293617419
https://cepagram.com/index.php/2019/11/20/apakah-comprehensive-project-insurance-asuransi-proyek-komprehensif/
https://cepagram.com/index.php/2019/10/16/asuransi-alat-berat-konstruksi-contractors-plant-machinery-cpm-insurance/
https://thejournal.cii.co.uk/news/cii-ambassador-supports-local-training-in-indonesia/
https://www.youtube.com/watch?v=ZAg3ECpwIiM
LPP Indonesiaku CERDAS | Workshop Asuransi Alat-alat Berat | Analisis Polis CPM Munich RE...
LPP Indonesiaku CERDAS | Workshop Asuransi Alat-alat Berat | Analisis Polis CPM Munich RE dan Aplikasinya | Senin, 31 Agustus 2020 | 0900 s/d...
MAJOR RISKS ASSOCIATED WITH DAM CONSTRUCTION – Risiko Utama dalam Konstruksi Bendungan
MAJOR RISKS ASSOCIATED WITH DAM CONSTRUCTION
A dam is a Civil Engineering construction which serves to contain the water of a natural course with...
Analisis Risiko Konstruksi dan Operasional DAM – Bendungan (Klaim dan Solusi Reasuransi) – Sejalan...
Analisis Risiko Konstruksi dan Operasional DAM - Bendungan (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020 – 03 Agustus 2022
Link Pendaftaran: https://bit.ly/Seminar-3Aug22
Apakah Comprehensive Project Insurance – Asuransi Proyek Komprehensif
Comprehensive project (CP) insurance - Non-renewable (one off) covers
Comprehensive project insurance offers all-in-one insurance protection for the entire duration of a project. The multi-line...
WDA – Pelatihan ONLINE – Analisis Pabrik BAJA dan Solusi (Re)Asuransi – Rabu 26...
WDA – Pelatihan ONLINE – Analisis Pabrik BAJA dan Solusi (Re)Asuransi – Rabu 26 Mei 2021 | 0900 – 1200 | POJK no. 44/2020
Telepon:
...
WDA – Pelatihan ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit...
WDA – Pelatihan ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit Listrik Tenaga Uap Batubara dan Asuransinya Sejalan dengan Tujuan POJK no....
Analisis Risiko – Financial Gap dan Parametric Insurance – Sejalan dengan POJK no. 44/2020...
Analisis Risiko – Financial Gap dan Parametric Insurance – Sejalan dengan POJK no. 44/2020 - 18 Agustus 2022
Link Pendaftaran:
https://bit.ly/Seminar-18Aug22
https://cepagram.com/index.php/2021/12/18/disaster-risk-financingdrf-pembiayaan-risiko-bencana/
https://cepagram.com/index.php/2020/09/19/evolution-parametric-insurance-evolusi-asuransi-parametrik/
https://cepagram.com/index.php/2020/06/12/apakah-asuransi-paramaterik-parametric-insurance/
https://cepagram.com/index.php/2020/06/04/asuransi-parametrik-parametric-insurance-fills-gaps-traditional-insurance-falls-short/
https://cepagram.com/index.php/2020/05/30/kisah-lain-tentang-asuransi-parametrik-triggered-parametric-insurance-natural-catastrophe-losses/
WDA Webinar – Faulty Design dalam Asuransi Konstruksi CAR – Rabu 08 Juli...
WDA Webinar - Faulty Design dalam Asuransi Konstruksi CAR -
Rabu 08 Juli 2020 - 0900 s/d 1200
Telepon:
Muhammad Subhan 0817009246 dan 081808024856
Ridho 087886475560
...