Unauthorized drainage works caused flooding at Pasir Ris-Tampines junction, PUB to take action against...

Unauthorised drainage works caused flooding at Pasir Ris-Tampines junction, PUB to take action against company Flooding was reported at the junction of Tampines Avenue 10...

Part of park connector near Clementi BTO site closed after landslide – Penghubung taman...

Part of park connector near Clementi BTO site closed after landslide The site has now been cordoned off for public safety. ST PHOTO: JOYCE FANG Shermaine Ang and Yong...

Nicoll Highway collapse – Robohnya Jalan Nicoll

Nicoll Highway collapse From Wikipedia, the free encyclopedia Nicoll Highway collapse Nicoll Highway construction site in 2007 Date 20 April 2004; 18 years ago Time 15:30 SST Location Singapore Coordinates 1°18′9.16″N 103°51′57.47″E Cause Highway collapse Deaths 4 Non-fatal injuries 3   The Nicoll Highway collapse was a constructionaccident that occurred...

Apakah Risk Base Capital? (RBC)

Apakah Risk Base Capital? (RBC)   Risk Based Capital (RBC) adalah metode perhitungan kesehatan perusahaan asuransi yang diwajibkan oleh Otoritas Jasa Keuangan (OJK). Secara sederhana, RBC adalah rasio...

WDA Online Training | Analisis Risiko Operasional dan Konstruksi PerTAMBANGan, termasuk Analisis Klaim dan...

WDA Online Training | Analisis Risiko Operasional dan Konstruksi PerTAMBANGan, termasuk Analisis Klaim dan Solusi Reasuransinya Sejalan dengan Tujuan POJK no. 44/2020 terkait Pengelolaan...

WDA – Pelatihan ONLINE – Analisis Risiko Mall dan Hotel dan Solusi (Re)Asuransi –...

WDA – Pelatihan ONLINE – Analisis Risiko Mall dan Hotel dan Solusi (Re)Asuransi – Rabu, 21 Desember 2022 | 0900 – 1200 | POJK no....

Analisis Risiko Konstruksi WET-RISKS (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020...

Analisis Risiko Konstruksi WET-RISKS (Klaim dan Solusi Reasuransi) – Sejalan dengan POJK no. 44/2020 –  Rabu, 14 Desember 2022     Link Pendaftaran:  https://bit.ly/Seminar-14Des22 https://cepagram.com/index.php/2022/06/03/analisis-risiko-konstruksi-wet-risks-klaim-dan-solusi-reasuransi-sejalan-dengan-pojk-no-442020-13-juli-2022/   https://cepagram.com/index.php/2021/04/28/analisis-risiko-konstruksi-wet-risks-klaim-dan-solusi-reasuransi-sejalan-dengan-pojk-no-442020/   https://cepagram.com/index.php/2021/12/08/swiss-re-epi-56-cofferdam-endorsement/  

WDA Online Training | Analisis Risiko Konstruksi dan Operasional Jembatan, Analisis Klaim dan Solusi...

WDA Online Training | Analisis Risiko Konstruksi dan Operasional Jembatan, Analisis Klaim dan Solusi Reasuransinya Sejalan dengan Tujuan POJK no. 44/2020 terkait Pengelolaan Manajemen...

WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan Udara termasuk Analisis...

WDA – Pelatihan ONLINE – Analisis Risiko Konstruksi dan Operasional Pelabuhan Udara termasuk Analisis Klaim dan Solusi (Re)Asuransi – Rabu 30 November 2022 |...

Seminar WDA ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit Listrik...

Seminar WDA ONLINE – Coal-Fired Power Plant Risks and Insurance – Risiko Pembangkit Listrik Tenaga Uap Batubara dan Solusi (Re)Asuransinya Sejalan dengan Tujuan POJK...
- Advertisement -birdie-kitabisa-com

MOST POPULAR

HOT NEWS