Tuesday, July 16, 2024
Google search engine
HomeAsuransiJH143 Shipyard Risk Assessment - Penilaian Risiko Galangan Kapal JH143

JH143 Shipyard Risk Assessment – Penilaian Risiko Galangan Kapal JH143

JH143 Shipyard Risk Assessment

JH 143 survey evaluate a yard in terms of the following areas:

• Environmental and Geographical Risks
• General Site Conditions & Housekeeping
• Site Safety
• Yard equipment
• Theft & Personnel
• Emergency Response Plans
• Fire-Fighting Systems
• Permit to Work Systems
• Atmospheric Monitoring and Control of Industrial Gases
• Launching and Sea Trials
• Processes and Procedures
• Quality Assurance/ Quality Control
• Management of subcontractors
• Casualty History

 

Terjemahan bebas:

 

Penilaian Risiko Galangan Kapal JH143

Survei JH 143 mengevaluasi galangan berdasarkan area berikut:

• Risiko Lingkungan dan Geografis
• Kondisi Lokasi Umum & Tata graha
• Keamanan Lokasi
• Peralatan Galangan
• Risiko Pencurian & Personil
• Rencana Tanggap Darurat
• Sistem Pemadam Kebakaran
• Izin Sistem Kerja
• Pemantauan dan Pengendalian Atmosfer Gas Industri
• Peluncuran dan Uji Coba Laut
• Proses dan Prosedur
• Jaminan Mutu/ Pengendalian Mutu
• Manajemen subkontraktor
• Riwayat Kerugian/Kecelakaan

 

 

RELATED ARTICLES
- Advertisment -
Google search engine

Most Popular

Recent Comments